Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 28 results ...

Abeytunga, P K (1978) The role of the first line supervisor in construction safety: the potential for training, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Albarkoly, K (2017) Exploring the maintenance practices and strategies in the Libyan cement industry, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Allenby, V R (1986) Cost models for engineering services, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Alqubaisi, S (2019) Developing a framework to assess the portfolio governance, risk and compliance of Abu Dhabi Government entities in the UAE, Unpublished PhD Thesis, , Aston University.

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes, Unpublished PhD Thesis, , Aston University.

Berny, J (1988) Forecasting and risk analysis applied to management planning and control, Unpublished PhD Thesis, Aston Business School, Aston University.

Byrd, R H (1981) The mathematical modelling of the environmental performance of buildings as an aid in the design process, Unpublished PhD Thesis, , Aston University.

Callcott, A E (1985) Microcomputers for civil engineering consultancy in developing countries, Unpublished PhD Thesis, , Aston University.

De Garay, A (1982) Evaluation of public housing strategies in Mexico City: an exploratory goal programming approach, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

El Bakry, S M (1981) Measurement of productivity and cost of the direct labour organisation within highways maintenance departments, Unpublished PhD Thesis, , Aston University.

Flanagan, R (1980) Tender price and time prediction for construction work, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Haghdadi, H (1989) The role of micro computers on the construction site, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Izzat, R M (1977) A computerised approach to bidding strategy in civil engineering, Unpublished PhD Thesis, , Aston University.

Jesson, J K (1988) Ethnic minority builders: a comparative study of Britain and the United States of America on affirmative action in the building industry, Unpublished PhD Thesis, Aston Business School, Aston University.

Johnston, J O D (1975) Development of a computerised library system in the construction industry, Unpublished PhD Thesis, , Aston University.

Jones, A M (1990) Design and construction for traditional house building, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Kim, K (2015) Conceptual building information modelling framework for whole-house refurbishment based on LCC and LCA, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Kotula, M (2013) Development of a risk-oriented strategic sourcing framework for the construction and electronics manufacturing industries, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

McLeish, D C A (1978) House building productivity: A study of labour requirements on Scottish house building sites using activity sampling methods, Unpublished PhD Thesis, , Aston University.

  • Type: Thesis
  • Keywords: building site; house building; labour requirements; productivity; variations; operatives; England; labour productivity; activity sampling
  • ISBN/ISSN:
  • URL: https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.464409
  • Abstract:
    This study is concerned with labour productivity in traditional house building in Scotland. Productivity is a measure of the effective use of rescurces and provides vital benefits that can be combined in a number of ways. The introduction gives the background to two Scottish house building sites (Blantyre and Greenfield) that were surveyed by the Building Research Establishment (BEE) activity sampling method to provide the data for the study. The study had two main objectives; (1) summary data analysis in average manhours per house between all the houses on the site, and (2) detailed data analysis in average manhours for each house block on the site. The introduction also provides a literature review related to the objectives. The method is outlined in Chapter 2, the sites are discussed in Chapter 3, and Chapter 4 covers the method application on each site and a method development made in the study. The summary data analysis (Chapter 5) compares Blantyre and Greenfield, and two previous BEE surveys in England. The main detailed data analysis consisted of three forms, (Chapters 6, 7 and 8) each applied to a set of operations. The three forms of analysis were variations in average manhours per house for each house block on the site compared with; (1) block construction order, (2) average number of separate visits per house made by operatives to each block to complete an operation, and (3) average number of different operatives per house employed on an operation in each block. Three miscellaneous items of detail data analysis are discussed in Chapter 9. The conclusions to the whole study state that considerable variations in manhours for repeated operations were discovered, that the numbers of visits by operatives to complete operations were large and that the numbers of different operatives employed in some operations were a factor related to productivity. A critique of the activity sampling method suggests that the data produced is reliable in summary form and can give a good context for more detailed data collection. For future work, this could take the form of selected operations, with the context of an activity sampling survey, that would be intensively surveyed by other methods.

Nayfeh, M (1989) A combination of cyclone and vert techniques for the management of construction projects, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Panopoulos, G D (2003) Economic aspects of safety in the Greek construction industry, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Parker, M A (2022) Developing a performance index to measure soft skills on construction projects: a Delphi study, Unpublished PhD Thesis, , Aston University.

Peckitt, S J (2001) Construction industry safety culture: a comparative study of Britain and the Caribbean, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Prabhu, S P (1980) Effective tendering for large scale overseas turnkey projects, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Sidwell, A C (1982) A critical study of project team organisational forms within the building process, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Skinner, D W H (1979) An analysis of the utility of bills of quantities in the process of building contracting, Unpublished PhD Thesis, , Aston University.

Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems, Unpublished PhD Thesis, , Aston University (United Kingdom).